TKL Earthworks has earned a reputation for reliability over the past 8 years in the Construction Industry operating over a wide geographical area.

This has been achieved and retained by an ever increasing attention to planning, organisation and management in every stage of the contract with the aim of giving total satisfaction to the Client and his professional team.

earthworks2

A Proven Track Record

This approach has led on many occasions to repeat orders, and of equal importance to our company name being passed on, which in turn assists ourselves in maintaining a suitable workload.

A common factor across each of our divisions is the focus on Earthmoving where TKL has a proven track record in recent Industrial, Commercial and Residential Developments.

remediation image 3

Latest Technology

We use the latest technology to aid production and supply real time information to our clients, keeping them informed of the dynamic environment, with our staff using portal tablets to instantly update site plans, records and other Metrics.

We offer a full estimating and survey service using the latest software and GPS technology to provide quicker, more accurate outcomes. Geographic locations – Midlands and the North of England

CLIENTCONTRACTVALUEOUTLINE OF WORKS
Clugston ConstructionRedhouse, Doncaster£1,635,000Topsoil strip, bulk earthworks ground engineering, land drainings On site production of aggregates.
Clugston ConstructionImmingham£1,600,000Site clearance,Topsoil removal cut/fill, supply and lay of bulk fills
Bowmer & KirklandDIRFT, Daventry£785,000Site Clearance, Bulk Earthworks
Tolent ConstructionRailport, Doncaster£1,400,000Moving 450,000m3 of material on site, Importing 1000,000 tonne of 150mm clean stone.
Thyssen ConstructionRiver Rother, Orgreave£800,000Creating new river course moving 450,000m3 in 12 weeks, laying geotextile, laying RIP RAP
Bernhards LandscapesEarthcentre, Doncaster£83,500Excavate & Clay line agricultural pond, Import 3000m3 clay
Quarmby ConstructionCrystal Peaks, Sheffield£400,000Bulk earthworks. Supply and lay hardcore, sub bases etc
JF FinneganB&Q Warehouse, Sheffield£455,000Demolition of former bus depot. Decontamination of site. Excavate & filling on site - 50,000m3 crushing concrete/buildings - 30,000m3 importation of bulk fill (Class 1A) - 15,000m3